Still Waiting
On 5/28/2010 we discovered water on the floor in the hall way just outside the door leading to the Hot Water Heater.
Well it wasn’t long before we uncovered that it was not a problem with the Hot Water Heater itself, but a pipe that was in the wall behind the kitchen sink and it had a gaping hole in it, and water was pouring out.
Within about an hour we had a crew on sight, setting up not one dehumidifier, but several to take the built up moisture out of the walls and cabinets. After several days, they were removed and the walls were more like normal but the cabinets had to be taken out and replaced.
Today we were to have a new vinyl floor put in, but there was a problem with the order and the wrong vinyl was brought out. So no new floor.
That will have to wait until the 17Th. Luckily, it’s August 17Th, not September 17Th.
That might get me a little angry.


